SIOUX FALLS, S.D. (KELO.com) – The reconstruction of the bridge at the Outdoor Campus in Sioux Falls is almost complete.
The bridge was heavily damaged in the March 2019 flooding. The City of Sioux Falls has been working to re-open this bridge and also the Dunham Park bridge which was swept away in the floodwaters. You can look for both projects to be completed by the end of the year.